[test-results] [Bamboo] Asterisk - Team Branches > Bridge Construction > #260 was SUCCESSFUL (with 413 tests). Change made by root.
Bamboo
bamboo at asterisk.org
Sat Apr 27 15:50:37 CDT 2013
-----------------------------------------------------------------------
Asterisk - Team Branches > Bridge Construction > #260 was successful.
-----------------------------------------------------------------------
Code has been updated by root.
All 2 jobs passed with 413 tests in total.
http://bamboo.asterisk.org/browse/ASTTEAM-BRIDGECONSTRUCTION-260/
--------------
Code Changes
--------------
root (386761):
>Tweak res_sip priority so it gets loaded first before all other SIP stuff.
>........
>
>Merged revisions 386760 from file:///srv/subversion/repos/asterisk/trunk
>
--
This message is automatically generated by Atlassian Bamboo
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.digium.com/pipermail/test-results/attachments/20130427/7fe6fa7d/attachment.htm>
More information about the Test-results
mailing list