[asterisk-bugs] [JIRA] (ASTERISK-26905) pjproject_bundled: Merge 3 upstream deadlock patches into bundled

Friendly Automation (JIRA) noreply at issues.asterisk.org
Thu Apr 6 10:26:59 CDT 2017


    [ https://issues.asterisk.org/jira/browse/ASTERISK-26905?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=236409#comment-236409 ] 

Friendly Automation commented on ASTERISK-26905:
------------------------------------------------

Change 5407 merged by George Joseph:
pjproject_bundled: Add 3 upstream patches

[https://gerrit.asterisk.org/5407|https://gerrit.asterisk.org/5407]

> pjproject_bundled:  Merge 3 upstream deadlock patches into bundled
> ------------------------------------------------------------------
>
>                 Key: ASTERISK-26905
>                 URL: https://issues.asterisk.org/jira/browse/ASTERISK-26905
>             Project: Asterisk
>          Issue Type: Bug
>          Components: Resources/res_pjsip, Resources/res_pjsip/Bundling, Third-Party/pjproject
>    Affects Versions: 13.14.0, 14.3.0, GIT
>            Reporter: Ross Beer
>            Assignee: George Joseph
>
> There are 2 upstream deadlock patches that should be merged into the bundled pjproject.
> https://trac.pjsip.org/repos/ticket/2001 [https://trac.pjsip.org/repos/changeset/5572]
> https://trac.pjsip.org/repos/ticket/2002 [https://trac.pjsip.org/repos/changeset/5573]
>  
> The second patch will require a configure.ac and pjsip_distributor patch to detect and use the new pjsip_tsx_layer_find_tsx2 function instead of pjsip_tsx_layer_find_tsx.



--
This message was sent by Atlassian JIRA
(v6.2#6252)



More information about the asterisk-bugs mailing list